subscribe to rss feed

WaterGurus NovaProject

WaterGurus NovaProject is our professional range of wastewater treatment and portable water recycling plants. Installations are available from 20kL per day to 6ML per day, delivered in a modular solution to match the size of each project.

Using WaterGurus’s unique MembraneSafe™ technology, NovaProject systems can produce Class A(+) water suitable for reuse in many applications, including toilet flushing, vehicle washing and irrigation.

WaterGurus MembraneSafe Technology

WaterGurus’s MembraneSafe technology provides a number of benefits to the customer:

  • Standby and duty as standard, increasing reliability
  • Low operational cost
  • Low noise and odour
  • Small footprint, easy to place
  • Low chemical consumption

WaterGurus NovaProject is ideal for domestic and industrial developments, retirement villages, environmentally sensitive sites, factories, schools, caravan parks and golf or sports clubs. Whatever the location or application, we can provide a solution to suit your water needs.

watergurus_novaprojectwatergurus_novaproject2 

Specifications (varies on size of project):  

  • System Treatment Capacity: 20kL to 6ML / day
  • Treatment Process Membrane: Bio Reactor Fully Aerobic Digestion
  • Effluent quality: Class C, B , A – A(+)
  • Footprint: From 10m x 8m
  • Odour Level: Undetectable (shed can be evacuated via odour retractor)
  • Noise Rating: From 63.5Db (can be reduced by using enclosures if required)

Visual Appearance

  • Control Shed: Colourbond
  • Tanks: Above ground poly or concrete in situ
  • Platforms: Aluminium AS1657

Operation and Maintenance

  • Normal Operation: Automatic
  • Operator Input – cumulative
  • Daily: Approx. 15 minutes
  • Weekly: Approx. 1 hour
  • Monthly: Approx. 1.5 hours

Operational Costs

  • Sludge Production: 0.03kg tss/KL treated
  • Cost per KL treated: From 62 cents (based on approx. $0.16/KWH) 

If fitted:

  • Chlorine Consumption: From 2.3lt/Day (13.5% Sodium Hypochlorite)
  • PH Correction: From 40g/day
  • Alum Dosing: From 8.6lt/day
  • UV Lamp Replacement: Annually / 8760hrs

 novaprojecttable

« Back